IMETCO QUOTE REQUEST FORM

***Projects with materials being purchased through a cooperative procurement program (CMAS, US Communities, etc.) must be coordinated with the program manager.  For these projects, do not proceed with this quote request form.  Email the project details and request to quotes@imetco.com, along with stating the type of contract. ***

Contact IMETCO directly for rush requests. Fulfillment Goals: 

·         Standard options - 2 Days

·         Specialty Processing (i.e Perforating, Post Painting, etc.) - 4 days

·         Custom Manufacturing - 2 Weeks

·         Lump Sum - 2 Weeks

Quote Setup















Product Selections



Series 300






Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.







Zip-Rib






Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.







TwinLok





Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.






PermLok






Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.





SS Panel



Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.




7.2 Rib





Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.




Cor-Pan







Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.




Element





Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.


FW Series





Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.






Latitude





Perforation cost varies by quantity, pattern, and material.  List as many details as you can in the comment field for the panel that needs perforation.  If the pattern is undefined, then 1/4" Holes at 3/8" Centers Staggered 40% Open will be used
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.







Legacy




Maximum dimensions are 24" x 96".  Best matl efficiency at 21.5" wide.

Maximum square dimensions are 24" x 24".  Best matl efficiency at 21.5" wide.

For square panel turned 45 degrees, use "Square" Panel Shape. Area of one diamond = 1/2 x B x H

Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.





PermWall 1.0




Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.




R-Panel



Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.




SP 120


Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.



RainScreen Options





If "Other", note in comments section below.

For warrantied systems, consult with IMETCO Engineering for proper design

Coping
Sloped Coping
Sloped Coping
Peaked Coping
Peaked Coping
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.







Fascia
Fascia - Standard
Fascia Standard
Fascia - with Vee
Fascia with Vee
Fascia - Extender
Fascia Extender
Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.







Gutter
A-Style
A-Style
D-Style
D-Style
Downspout
Downspout
Round Gutter
Internal Gutter
Please detail in comments and provide drawing separately if possible

Material Selection
Please refer to the IMETCO Material Availability Chart.  Minimum quantities and extended lead times apply to some selections.